Cylinder deck footings and Sonotube forms: pick diameter and depth, set how many piers, add a waste margin, get cubic feet, cubic yards, and bag counts.

Tube / footing diameter

Concrete needed

13.82 cu ft

0.512 cu yd · one footing 3.14 cu ft

40 lb bags (0.3 cu ft)
47
60 lb bags (0.45 cu ft)
31
80 lb bags (0.6 cu ft)
24

Formula

Volume of one cylinder (inches): V = π × (diameter ÷ 2)² × depth ÷ 1728 cubic feet. Multiply by the number of footings, then by (1 + waste ÷ 100). Cubic yards = cubic feet ÷ 27. Bag counts use common bagged-concrete yields of 0.30 / 0.45 / 0.60 cu ft for 40 / 60 / 80 lb bags; round up.

Example: four 12" tubes, 48" deep, 10% waste → one footing ≈ 3.14 cu ft; four ≈ 12.57 cu ft; with waste ≈ 13.82 cu ft (≈ 0.512 cu yd) → about 47×40 lb, 31×60 lb, or 24×80 lb bags.